Universal Studios Singapore
Universal Studios Singapore
Pico Play was the major theming design and build contractor for four zones at Universal Studios Singapore, with a contract value exceeding SGD40m. The project was completed within an impressive 15-month period, from October 2008 to February 2010, to align with the opening of adjacent hotels and casinos. The design team in Kuala Lumpur expedited the design and construction documentation stages, prioritizing elements with longer lead times for early procurement and off-site fabrication.
Solution
Pico Play self-performed the theming fabrication in their production facility in Johor, Malaysia. With a skilled team of supervisors, artisans, and fabricators, they successfully integrated complex sculptures and themed elements into the building facility and ride systems. This approach, a fundamental strategy for Pico theming projects, eliminated the need for traditional procurement methods and multiple layers of sub-contractors.
Results
Pico Play's in-house team of designers, managers, artists, and fabricators successfully delivered a collection of Universal standard theming within a record-breaking 15-monthperiod. Their close collaboration and efficient work ensured timely completion of the project.